How many coats are required?
Our products can be applied at any given thickness depending on the application required. The product being applied and the thickness required determine the number of coats needed.
In general, plan on one thick coat on the horizontals and 2 to 3 coats on the verticals. The extra coats do not require full cure. You can apply a second or third coat once the product is set. This is usually about 1 to 2 hours at 75 degrees.